Shaw’s Supermarket Waterbury, Vermont
Developer: Halverson Holdings, LLC
Year: 2004/2005
Dale E. Percy Inc. was contracted by Halversen Holdings to perform all of the sitework related to the construction of the new Shaws Supermarket in Waterbury, Vermont. The site had numerous challenges. We prepared the building pad and site, working closely with the geotechnical engineers, to ensure a stable site. The water lines, sewage disposal system, and stormwater collection and treatment system was installed the following year, as was the parking lot and the final building structure.
Merchants Bank Waterbury, Vermont
Developer: Halverson Holdings, LLC Contractor; Connor Contracting
Year: 2006
Dale E Percy Inc. was contracted by Connor Contracting to perform all of the sitework at the former Coffin’s site, for the new Merchant’s Bank branch office. The site had several challenges, and we worked with geotechnical engineers, and the State of Vermont, to solve them. Along with water, sewer, and parking areas, we constructed a connector road to the rear of the Shaws Supermarket site for customer access.
Trapp Family Lodge, Stowe
Dale E. Percy Inc. has been involved with many of Trapp’s projects over the years. Most recently was the installation of municipal water and sewer lines from Barrows Road to Trapps property. We also were the prime site and utility contractor for the Villas project.
Spruce Camp Base Lodge, Stowe
Contractor: Engelberth Construction
Year: 2007-2009
Percy’s was involved with all the sitework, utilities, curbing, frost walls, and slab prep.
Mountain Cabins at Spruce Peak
Contractor: Engelberth Construction
Years: 2004-2008
We worked on all the sitework, utilities, curbing, slab prep and parking to many cabins.
Topnotch Resort & Spa, Stowe
Percy’s has been involved in many Topnotch projects over many years including the Spa, townhouses, utilities, and infrastructure improvements.
Stoweflake Resort & Spa, Stowe
Percy’s has been involved in many Stoweflake projects over many years including the Spa, additions to the hotel, all townhouses, utilities, sewer systems, ponds, roads and infrastructure improvements
Chittenden Bank
Contractor: DEW Construction
Year: 2008
All sitework, slab prep, signs, curbing, parking lot & utilities
Town of Stowe Recent Projects
- Rip Rap Project on Goldbrook Road (top two photos above) – Heavy rain caused a portion of the bank to slide. Dale E. Percy, Inc. repaired the damage and stabilized the bank.
- School Street Water Line (shown above, bottom left) – Installation of 1100 LF of 8’’ water line and associated services.
- Main Street Lighting (shown above, bottom right) – Installation of historic lighting, light poles, bases, conduit & wiring.
Other projects include, the building of Brownsville Road (2007) and in history, the building of development roads such as Goldbrook Circle, Upper Hollow Hill Road, McAllister Road, and Barrows Road among others in the 1960s & 1970s, and placement of waterlines and sewer lines throughout the town over the years.
Ethan Allen Firing Range
Contractor: DEW Construction
Year: 2008
All sitework, slab prep, signs, curbing, parking lot & utilities
Ethan Allen Multi-Purpose Machine Gun Range
Contractor: E.F. Wall
Year: 2008- 2009
This site at Ethan Allen included a target practice machine gun range for VT National Guard. Utility work, roads and buildings was also included in this project.
Mansfield View Water Upgrade, Stowe
Year: 2009
Upgrading the water system for this development
Garcia Restaurant, Stowe
Contractor: Gordon Dixon Construction
Year: 2009
Demoliton of Mes Amis Restaurant to build new Garcia Restaurant. Percy’s was involved with demolition, utilities, and parking.