Skip to content

269 Weeks Hill Road Stowe, VT 05672

802-253-8503

Get Connected With Us

percy_logo
  • Home
  • Products
  • Services
  • Featured Projects
  • About Us
  • Employment
  • Contact
Commercial Projects Collapse

Town of Stowe Sidewalk Reconstruction

Town of Stowe Sidewalk Reconstruction

Building Demolition (Malt Shop)

Building Demolition (Malt Shop)

Kingdon Community Wind Farm Level Spreader Relocation

Kingdom Community Wind Farm Level Spreader Relocation

Kingdom Community Wind Farm Level Spreader Relocation (2)

Kingdom Community Wind Farm Level Spreader Relocation 2

Mud City Loop Box Culvert

Mud City Loop Box Culvert

Town of Fletcher Box Culvert

Town of Fletcher Box Culvert

Town of Fletcher Box Culvert (2)

Town of Fletcher Box Culvert (2)

Box Culvert Replacement Installation

Box Culvert Replacement Installation

Switchback Road Construction

Switchback Road Construction

Pre-Treatment System (local brewery)

Pre-Treatment System (local brewery)

Pretreatment Tank (local brewery)

Pretreatment Tank (local brewery)

Norwich University Upper Parade Ground Beautification Project (in progress)

Norwich University Upper Parade Ground Beautification Project (in progress)

Norwich University Upper Parade Ground Beautifictaion Project (complete)

Norwich University Upper Parade Ground Beautification Project (complete)

Electrical Conduit Installation

Electrical Conduit Installation

Sunrise Snow Removal at Stowe Mountain Resort

Sunrise Snow Removal at Stowe Mountain Resort

Residential Projects Expand

Residential Driveway Expansion (in progress)

Residential Driveway Expansion (in progress)

Residential Driveway Expansion (complete)

Residential Driveway Expansion (complete)

Staymat Driveway Resurfacing

Staymat Driveway Resurfacing

New Driveway Access

New Driveway Access

New Driveway Construction (boxing out driveway before importing material)

New Driveway Construction (boxing out driveway before importing material)

New Driveway Installation

New Driveway Installation

Ditch Rock Install

Ditch Rock Install

Failed Culvert Replacement

Failed Culvert Replacement

Failed Culvert Replacement (2)

Failed Culvert Replacement (2)

Culvert Replacement

Culvert Replacement

Land Clearing and Slope

Land Clearing and Slope

Stumping and Land Clearing (in progress)

Stumping and Land Clearing (in progress)

Stumping and Land Clearing (before final topsoil)

Stumping and Land Clearing (before final topsoil)

Stormwater Pond and Erosion Control

Stormwater Pond and Erosion Control

Stormwater Pond and Planting

Stormwater Pond and Planting

Subdivision, Land Clearing, and Road Building

Subdivision, Land Clearing, and Road Building

Subdivision, Land Clearing, Road Building (hammer)

Subdivision, Land Clearing, and Road Building (hammer)

Our Location

269 Weeks Hill Road Stowe, VT 05672

802-253-8503

Business Hours

We are open from Monday through Friday
7:00 am - 4:30 pm

Employment Opportunities

Please select the Employment button below to fill out an employment application.

Employment

Get Connected With Us

percy_logo

© 2021 Dale E. Percy, Inc. All Rights Reserved.

Website Design & Development by VT Web Marketing